Process involved in subdividing land: From Preliminary Investigation to Final Certification
Subdividing your land can be a complex process, but with the right guidance, it can be very rewarding. This is a step-by-step guide explaining the process involved in subdividing land, from the initial preliminary investigation to the final certification.
Preliminary Investigation
The first step in subdividing your land is conducting a preliminary investigation. This involves assessing the feasibility of the subdivision, considering factors such as zoning regulations, environmental considerations, and access to utilities.
Survey
Once the preliminary investigation is complete and the feasibility of the subdivision is confirmed, the next step is to conduct a survey of the land. This survey will determine the boundaries of the new lots and ensure compliance with local regulations.
Subdivision Design
With the survey completed, the next phase is subdivision design. This involves creating a detailed plan for the layout of the new lots, including considerations such as road access, drainage, and utilities.
Road and Drainage Design
In addition to subdivision design, road and drainage design are crucial components of the process. This involves planning and designing the infrastructure necessary to support the new development, including roads, sidewalks, and drainage systems.
Consultants Reports
Throughout the subdivision process, various consultants may be involved to provide expertise in areas such as environmental impact assessments, geotechnical studies, and traffic management.
DA Consent
Once the design phase is complete, the next step is to obtain Development Application (DA) consent from the local council. This involves submitting detailed plans and documentation for approval.
Construction
If construction is required as part of the subdivision process, it can begin once DA consent has been obtained. Prior to construction, a construction certificate or subdivision work certificate must be obtained, along with any necessary additional certificates.
Final Certification
Once construction is complete, the final step is to obtain certification for the subdivision. This involves submitting the final subdivision plan for approval, either to a certifier or to the local council. Once approved, the plan can be registered with the land registry services, completing the subdivision process.
By following these steps and working with experienced professionals, you can successfully navigate the process of subdividing your land for development. If you have any questions or need assistance with your subdivision project, don’t hesitate to reach out to us. We’re here to help you every step of the way.
Contact Us
Enter your details into the form and our team will be in touch within the next couple of hours.
To speak to one of our surveyors now, call us on: +61 02 4261 4366